
Suffolk Raw Water Main, Phase I & II
Installation of more than 38,000 LF of 36-inch ductile iron raw water main delivered through wetlands, highway crossings and active farmland.

Installation of more than 38,000 LF of 36-inch ductile iron raw water main delivered through wetlands, highway crossings and active farmland.

Mechanical and structural upgrades to a 24 MGD wastewater facility executed without a single day of plant downtime.

Coastal resilience program combining tide gates, floodwalls, living shoreline and pump stations across the Chesterfield Heights neighborhood.

Demolition and replacement of a six-million-gallon potable water storage tank delivered ahead of schedule and under budget.

Installation of 1,400 LF of HDPE outfall pipe through the surf zone, executed inside a 90-day environmental window.

Centrate equalization and hydraulic improvements increasing plant capacity by 18% with full integration into existing SCADA.